NPCIL interview experience

This article helps you to get an insight into what I experienced after my M. Tech at SVNIT, Surat. I appeared for the NPCIL interview on 05-10-2010 at Anushaktinagar in Mumbai. As I did M.Tech, I was shortlisted directly based on the qualification of M. Tech in Industrial Process Equipment Design (IPED).

NPCIL Interview Panel:

The interview panel consisted of 6-7 people from industries only, No one was from any academic institution. 
They normally asked me practical questions that were related to my specialization in M. Tech (Industrial Process Equipment Design) at SVNIT, Surat. Interviews were taken by three simultaneous groups, which means three different groups were taking interviews in separate rooms. I was waiting for my turn from the moment I reached the venue but it took 2 hours to get me to the interview room.

NPCIL Interview Process

I was asked many questions based on practical aspects of process equipment and nothing related to Nuclear energy. Everybody thinks that a company is related to power projects by Nuclear energy, so most of the questions will be from Nuclear engineering related but it was not as we thought.

The first question was thrown at me by the Chairman. He asked me to introduce myself to cover my educational qualifications and family background. I mentioned that I am basically from Bhavnagar, Gujarat & the same moment they asked me about the future site of NPCIL nearby Bhavnagar, Gujarat. As I was not sure about it, I honestly said NO.

Do not hesitate to say No because this will save you and their time. They look for positive and correct replies as many as from your side. If you do not know the exact answer please say No and admit it. So they can ask other questions or move ahead. Instead of it, if you try to fool them, they will ask more questions from the same background and you will ultimately leave a negative impression in the end, you will be failed because you have not managed time to give maximum correct answers as many as you can.

They wanted me to tell you about my dissertation in M. Tech. As it was related to pressure vessel design, they counter-questioned me about the code/standard used to design pressure vessels and manufacturing. I answered ASME Section VIII Division 2, Edition 2007. I was taken deep into the code/standard about the design of the pressure vessel and its manufacturing. How different guidelines were used while designing and manufacturing at the company following ASME codes? The next question was about the basics of pressure vessels by asking me the difference between pressure vessels and storage tanks. I tried to convince them about my knowledge but they did not agree. Also, they wanted me to tell them the relation between psi (pound per square inch) and kg per square centimeter. I answered 1 kg/cm2 = 14.22 psi.
Some members asked me how to design a heat exchanger for a particular application. What should be the pressure limit value in the pressure safety valve in a pressure vessel and why it is normally provided? and who decides it? Normally to ensure the safety of pressure vessels working at high pressure, one needs to put a safety valve to release extra pressure beyond the safe limit and save the pressure vessel from harm.
Another question: What is the difference between design pressure and maximum allowable working pressure in pressure vessel design terminology? Why the hydro test is conducted at the end of the manufacturing of pressure vessels? What should be the material that is filled inside the completed vessel, is it air or water, and why? And what is the compressible flow and what is its effect on it? In which situation the hydro test will be severe if it is filled and pressurized with air and water?
After some discussion, they changed the topic and led me to the power plant subject. They keep on asking me basic questions like what is the difference between the thermal and hydropower plant and which is more efficient in terms of handling cost. They wanted me to draw the PV and TS diagram of the Rankine cycle. And the last question was what should be the case when a condenser of the power plant is removed?
Overall my NPCIL interview was good but in that batch, no one was selected.
Get the official information on this NPCIL Official page.

Leave a Reply

Future trending areas in Mechanical Engineering All you need to know about Renewable Energy Sources